This is a platform alteration Part 2

After building the platforms out of Balsa and MDF, I was still unhappy with the finish of the platforms. I have since attempted construction with some wall filler material to create a flat surface. I created a mould using insulation tape to hold the filler and to help me give the platforms a uniform height. I think you will agree that the outcome looks pretty ok. There is only one end of the station that fouled a locomotive on a test run which will be rectified once the filler has completely set.

The raised section of the platform; this will soon be sanded flat.

Overall view of the station.

Carriages using the newly created platform 2.
 Below is an image of all of the rolling stock with a new addition to the railway, the embankment where I am going to build a small mine railway which will have an interchange with the siding at Effans Uchaf. This is a rather large divergence from my original plan but I have borrowed the idea from "Lower Peak Wharf" The layout that first inspired me to explore 009. I have only built the embankment on the station side for now, but will be adding more to the western side of the bridge in due course. 

A busy scene at Effans Uchaf with the newly created platforms playing host to all of the passenger rolling stock.

Comments

Popular posts from this blog

Restoration and new carriage

My biggest update so far...